A CK Technologies, Inc. CKT1175 has been installed in the new Airbus final assembly line (FAL) at Tianjin, China to verify the wiring integrity of critical aircraft circuits prior to the application of power to the aircraft's systems. This 30,000 test point CKT1175 is comprised of 116 LRU form-factor switching units, plus 5 suitcases switching units. The LRUs are designed for direct connectio... Read more Mon. Nov. 10, 2008
Please visit CK Technologies, Inc. at AeroTest America 2008. Ask us about solutions for all of your cable, harness and backplane testing requirements.
This event takes place on the 18th, 19th and 20th of November 2008 in Fort Worth, Texas.
To visit the AeroTest America 2008 homepage click HERE.
|
|