| - Installed Systems Examples - |
| High-Voltage Systems |
A. Wire Testing in the Maintenance Workshop
Engine Harness Testing at KLM |
B. Testing the F-35 (JSF) with the CKT1175
F-35 Forward and Center Fuselage Testing at
Lockheed Martin and Northrop Grumman |
- 32,000 test points shown.
- Suitcase switching units are cabinet mounted on slide-out drawers. This rack and stack approach facilitates test system reconfiguration.
C. Panel and Harness Testing
Harness and Panel Testing at Boeing |
- 15,000 test point CKT1175.
- Dual interface consisting of PDD dual-50 contact and Boeing 600 contact strip connectors.
D. Testing the F-15 with the CKT1175
F-15 Fuselage Section Testing at Boeing |
- 25,000 test point CKT1175 replaces obsolete test system.
- PDD dual-50 contact connectors for use with legacy adapters.
E. LRU Configured Switching Matrix
Testing Airbus Single-Aisle Aircraft After Final Assembly |
F. Mobile Switching Console with Adapters Attached
G. Testing the AIrbus A380 Super Jumbo
A380 Fuselage Testing at Airbus |
- 84,000 test point CKT1175.
- Switching systems implemented using suitcases and mobile cabinets.
- 16 mobile storage cart intelligent adapter cable management system.
H. Special Purpose Mobile CKT1175
I. Critical Systems Wiring Test After Final Assembly
Testing the Boeing C-17 After Final Assembly |
J. FACT-II Adapter Cable Compatibility
Switching Matrix with FACT-II Connector Interface |
|